Right side view in the New England Central Railroad yard at Willimantic, CT. One of five loaded racks waiting interchange to the Providence & Worcester Railroad for delivery to North Atlantic Distributors in Davisville, RI. These are the first loaded racks to come through Willimantic. A tri-level car built 11/2007, Length 93' 10", with UP rack"#UP21758 loaded with new Audis. |
Date:
5/12/2009 |
Location:
Willimantic, CT Map  |
Views:
105 |
Collection Of:

Leighton L. Haeseler |
Rolling Stock: |
Author: Leighton Haeseler
|
a.jpg) |
Picture Categories: RollingStock |
This picture is part of album: ETTX equipment in CT |