At the end of the week, the CN track crews had laid the new turnout to within 100 feet of the connection point. The rolling stock to the left is part Griffith RR Historical Park |
Date:
6/25/2012 |
Location:
Griffith, IN Map |
Views:
96 |
Collection Of:
Gary Everhart |
|
Author: Gary Everhart
|
|
Picture Categories: Roster,Track,Action |
This picture is part of album: CN to EJE Turnout Construction, Part 2 |